Our latest picture gallery showing how work is progressing on the Danum Gallery, Library and Museum, the cinema, and the University Technical College, all being constructed on Waterdale, shows how the inside fittings and the branding are now appearing.
The opening of the museum has been delayed by the Covid 19 crisis, and there is still no date finalised for its opening. But our new pictures, taken this week, show the Danum branding on the glass, as well as the fittings in the library in place, and the furniture which will allow people to sit inside the glass atrium around the former Doncaster girls high school façade.
Officials have said the cinema could open this month. Although work is still going on, our pictures show the fittings clearly in place in the entrance hall, with the drinks dispenser counter visible. And the Savoy branding is now installed at the top of the main entrance.
And the pictures also show how the UTC is progressing, with plans to open it to students after October half term.

1. Library entrance
The entrance to the library from Chamber Road looks complete and library shelves are visible inside, as well as the branding that can be seen on the glass at this entrance to the Danum Gallery, LIbrary and Museum Photo: David Kessen

2. Main atrium
Furniture in place in the main atrium next to the former girls' high school frontage. Photo: David Kessen

3. NDFP-09-10-20-Museum8 Sept 9-upload
The entrance to the Danum Gallery, Library and Museum through the door of the historic Doncaster girls' high school. Photo: David Kessen

4. Seating arrangement
Seating in place at entrance to the Danum Gallery, LIbrary and Museum, next to the former Doncaster girls' high school frontage Photo: David Kessen

